Portfolio
ARCHITECTURAL REPAIR
Scope Material Specification and Repair Methodology
Selected projects
2004 – Current | Pre-Repainting defect diagnosis scanning to façade for HDB for multiple projects |
2011 | Repair methodology for a Hostel for Young Women Christian Association |
2015 – Current | Pre-Repainting tender defect diagnosis work for Condominium for MCST for multiple projects |
2020 | Assessment of repair methodology for façade of a Factory at Tuas Avenue 2 for AIMS APAC Property Management Pte Ltd |
BUILDING DUE DILLIGENCE
Scope Mandatory and Compliance Audit, and Repair costing
Selected projects
2007 | Harbour Front Centre for Mapletree Investment |
2016 | Various Factories in Singapore for Jurong Town Corporation |
2019 | Buildings at Artillery Avenue for Sentosa Development Corporation |
2019 | Factory at Bulim Street for for AIMS APAC REIT |
2020 | 8 MOE Buildings for CPGFM Pte Ltd |
2020 | 6 Hawker Centres for Fonda Global Engineering Pte Ltd |
2021 | 68 Schools at North Zone for CPGFM Pte Ltd |
MATERIAL FAILURE ANALYSIS
Scope Testing program, Defect diagnosis and Repair specification
Selected projects
2007 | Assessment of Surface Brick Wall at Bukit Merah for Tanjong Pagar Town Council |
2010 | Assessment to External Façade of a commercial building at Orchard Road for SKK (Singapore) Pte Ltd |
2011 | Assessment of Window Integrity and External Plaster for a Hostel for Young Women Christian Association |
2012 | Assessment to Basement Flooring Parquet for a cluster housing for GTMS Construction Pte Ltd |
2016 | Assessment to Façade for a Community Club at Woodlands for People Association |
2017 | Assessment of Plaster at Façade for a Data Centre at Tampines for ACME Associates Pte Ltd |
INFRA-RED THERMOGRAPHY
Scope Infra-red scanning, Defect diagnosis, and Repair costing
Selected projects
2004 – Current | Pre-Repainting defect diagnosis scanning to façade for HDB for multiple projects |
2005 | 2005 Assessment of façade of Hilton Hotel for Raymond Construction Pte Ltd |
2005 | Pre-Repainting tender IRT work to estimate area of repair for Pantech Industrial Park for building owner |
2006 | Assessment of roof integrity for a HDB block at Bishan for EAC Corporation Pte Ltd |
2015 – Current | Pre-Repainting tender defect diagnosis work for Condominium for MCST for multiple projects |
2021 – 2022 | Convenor for working group for development of IRT standard for facade inspection in Singapore |
PROJECT MANAGEMENT
Scope Material and repair specification, Contract documentation and Project Management
Selected projects
2010 | Re-sealant work to Façade of Tiong Bahru Plaza and Tower for building owner |
2005 | Repair and Repainting Project at East Meadows Condominium |
2014 | Re-roofing to a Factory at Tuas Avenue 10 for building owner |
2016 | Façade repair to façade to a factory at Sunview Road for building owner |
2017 | Repair and Reroofing Project at Savannah CondoPark |
2017 | Repair and Repainting Project at Latitude Condominium |
2018 | Repair and Repainting Project at Faber Crest Condominium |
R&D AND PROFESSIONAL WORKS
Scope Application of Technology in Building Inspection
Selected projects
2019 | TR78: Building façade inspection using unmanned aircraft systems Working Group (Member) |
2019 | Drone Inspection System for Building Façade with partners Institute of Materials Research and Engineering, A*STAR; Institute of High Performance Computing A*START and Garuda Robotics Pte Ltd |
2020 | Building facade inspection and diagnostic using infrared thermography (IRT) Working Group (Convenor |